Skip to the content

Audit-ready on a Tuesday, not after a fortnight of notice

The records your regulator, your insurer or your biggest client requires, captured as the work happens and produced on demand in minutes.

Typically costs
£32k–£80k
Live in
820 weeks
Price yours properlyThree minutes, and it asks for nothing

Compliance records

8 parts

01Where this usually starts

Compliance evidence gets gathered in a panic before each audit, out of folders, inboxes and people's memories. You are fairly confident you are compliant, and you cannot prove it quickly, which in practice is the same problem.

02What changes

What you end up holding.

  • 01Evidence captured as the work happens rather than reconstructed afterwards
  • 02Anything expiring or missing visible now, with time to do something about it
  • 03An audit pack produced in minutes, covering whatever period is asked for
  • 04Records that cannot be quietly altered, with every change attributed
  • 05Retention handled properly: kept as long as required, disposed of when it should be

An audit that costs you an afternoon instead of a fortnight, with the evidence already gathered.

03The pieces

What a system like this is usually made of.

You will not want all of it on day one, and you should not pay for all of it on day one. The estimator lets you choose, and shows what each one adds.

Equipment and assets

Every tool, vehicle and installed unit, with its history, its service dates and where it is.

Forms

Filled in once, on a phone if need be, with the answers going straight where they belong.

Finding the document again

Everything filed where anyone entitled to see it can find it in seconds.

Checked against what you expected

Each document set against the order, the contract or the rate card, and held back when it disagrees.

Told when a number moves

A warning the day something goes the wrong way, not at the month end.

A record of who did what

Every change kept and attributed, readable without a technical explanation.

The audit pack

Whatever period is asked for, produced in minutes rather than a fortnight.

Certificates and expiry dates

What is lapsing, in time to do something about it.

The sort of detail that matters

  • You edit them yourself, without calling anyone
  • Last year's submissions still read as they did
  • A supplier invoice that does not match the order never gets posted

04How it would run

8 to 20 weeks, in five phases you approve one at a time.

  1. 01

    Getting to the truth

    A written account of how your work really runs today, what the current way is costing you, and what your new system has to do about it.

  2. 02

    Shaping it

    Every screen and every decision your system will make, in front of you and signed off, with your live date fixed at the end of it.

  3. 03

    Building it

    Your system takes shape week by week in your own account, with something you can click on and try at the end of every fortnight.

  4. 04

    Proving it

    Your own people put it through real work with real records, and everything they find is fixed before anybody depends on it.

  5. 05

    Going live

    Your team moves across trained, with their history intact, on the date fixed months earlier.

What happens in each of them

05Asked most often

The questions that come up.

Which regimes does this suit?

It is built around your obligations rather than a fixed list, and it has been applied to health and safety records, driver and vehicle compliance, right-to-work checks, professional certification, quality management and UK GDPR records of processing.

Does this make us compliant?

Complying is what your business does. This makes the evidence reliable, complete and quick to produce, which is what turns an audit from a fortnight into an afternoon.

Can we prove a record has not been altered?

Records can be made so that nothing is ever overwritten: a correction becomes a new entry and the original stays visible, which is exactly what your auditor is looking for.

06The rest of it

Most projects are two or three of these at once.

Put a date on it.

Half an hour with whoever would build it gets you the shape of the work, a figure you can take to your board, and the week it could start. No deck, no discovery fee, no follow-up sequence.