Skip to the content

Know what you have, where it is, and what it is doing

Stock, tools, vehicles and installed equipment tracked accurately enough that you stop buying things you already own.

Typically costs
£35k–£90k
Live in
1022 weeks
Price yours properlyThree minutes, and it asks for nothing

Stock and assets

4 parts

01Where this usually starts

Your stock figure is wrong and everyone knows it, so people order anyway. Tools disappear. Nobody can tell you with confidence what is installed at a given customer site, or when it was last serviced, without ringing the engineer who fitted it.

02What changes

What you end up holding.

  • 01A stock figure people trust, which stops the ordering of things you already have
  • 02Every tool, vehicle and piece of equipment traceable to a person, a van or a site
  • 03Service and calibration dates reaching you before they lapse, not after
  • 04Reordering that happens without you, at the right level, from the right supplier
  • 05A full history for everything you have installed, ready before the engineer arrives

A stock figure people trust, and service dates that reach you before they lapse rather than after.

03The pieces

What a system like this is usually made of.

You will not want all of it on day one, and you should not pay for all of it on day one. The estimator lets you choose, and shows what each one adds.

Stock

A stock figure people trust, across the unit and every van.

Reordering on its own

Ordered at the right level, from the right supplier, before you run out.

Equipment and assets

Every tool, vehicle and installed unit, with its history, its service dates and where it is.

Certificates and expiry dates

What is lapsing, in time to do something about it.

04How it would run

10 to 22 weeks, in five phases you approve one at a time.

  1. 01

    Getting to the truth

    A written account of how your work really runs today, what the current way is costing you, and what your new system has to do about it.

  2. 02

    Shaping it

    Every screen and every decision your system will make, in front of you and signed off, with your live date fixed at the end of it.

  3. 03

    Building it

    Your system takes shape week by week in your own account, with something you can click on and try at the end of every fortnight.

  4. 04

    Proving it

    Your own people put it through real work with real records, and everything they find is fixed before anybody depends on it.

  5. 05

    Going live

    Your team moves across trained, with their history intact, on the date fixed months earlier.

What happens in each of them

05Asked most often

The questions that come up.

Does this need barcodes or tags?

It works better with them, and you will be told plainly when they are worth the bother. Often a phone camera reading a label you already print does the job, and buying scanners is money you keep.

We hold stock in vans as well as the unit.

Every van is its own location, with what is on it, what came off it and what needs replacing before tomorrow morning.

Can it tell us what a job actually consumed?

Parts drawn against the job, priced, and set against what you charged for it. That comparison is usually where the money turns out to be.

06The rest of it

Most projects are two or three of these at once.

Put a date on it.

Half an hour with whoever would build it gets you the shape of the work, a figure you can take to your board, and the week it could start. No deck, no discovery fee, no follow-up sequence.