We are named after a date. Here is why that is not a gimmick.

Ask anyone who has commissioned software what went wrong last time. Almost nobody says the wrong thing got built. They say it was late, and it cost them the quarter.

The same project, run two ways

Both agreed in March
MarAprMayJunJulAugSepOctNovDecWHAT A RANGE DOESAgreed in March: four to six monthsJune: fineJuly: a fortnightAugust: noACTUALLY LIVEWHAT A DATE DOESLIVEThe part that earns its keepWhat they asked for secondWhat everyone touches dailyThe reporting, cut by you, six weeks later
Neither of these is a worse team. The difference is only which of the two things was allowed to move. Above, the date moved and nobody had to admit it until August. Below, the scope moved and you chose what went.

01The problem

A range is not a date, and everybody knows it

When a supplier says four to six months, the client hears four and the supplier means six. Nobody has lied and nobody has agreed anything. The number that gets written on the board paper is the optimistic one, and the number that gets delivered against is the other one.

Then something slips by a fortnight, which is nothing, and nobody raises it because the range still covers it. Three of those and the range does not cover it any more, and by then the conversation is a difficult one rather than an ordinary one.

A single date removes the hiding place. It is either going to be met or it is not, and everyone can see which from a long way off.

02How it is arrived at

We will not give you a date until we have earned the right to

Nobody can commit to a date before understanding the problem, and anyone who does it at the proposal is guessing with your money. Here the date is fixed at the end of the shaping phase, once every screen has been drawn and every rule written down.

By that point roughly a third of the thinking is done and perhaps a sixth of the money is spent. That is the earliest honest moment, and it is also early enough to be useful to you.

From then on the date does not move. It becomes the fixed point that every other decision is taken against.

03What protects it

Scope moves. Quality does not. The date does not.

When something takes longer than expected, and something always does, there are three things that can give: the date, the quality, or how much gets built. Most projects let quality give, quietly, because it is the only one nobody has to admit to.

We give on scope, openly, and you choose what gives. If the reporting is going to cost the launch, the reporting comes out and follows six weeks later. You will always prefer that to a system that arrives on time and cannot be trusted.

This is only possible because of how the build is ordered. The most valuable thing is built first, so what is left at the end is genuinely the least painful to postpone. That ordering is decided with you during shaping, and it is the single most important conversation of the whole project.

04When it does move

It has moved before, and you would have known within the week

Occasionally something genuinely unforeseeable happens: a supplier withdraws an interface, a regulator changes a rule mid-build, a key person on your side leaves. Those are the conditions under which a date moves.

What never happens is finding out late. You hear it the week it becomes visible, with the reason, the options and the cost of each. Then you decide, rather than being told what has already been decided.

A date that moves once, openly, with six weeks' notice, is a project being run properly. A date that holds right up until the fortnight before is a project about to go badly wrong.

05And the name

A date is the only promise in a software project that cannot be argued about afterwards. So there is one on the door, and there will be one on yours.

Get a date for yours.

One conversation gets you the month. One phase of discovery turns it into a commitment you can put in front of your board and hold us to.