Skip to the content

CRMSoftware shaped around your working day

Bespoke CRM development.
Built around your business.

Own a CRM that connects your customers to the work you deliver. Try nine working examples, compare the cost of subscriptions, and see what changes when your software follows your business.

Software you ownNo Sep17 licence per userA fixed date agreed in phase two
Same foundation. Different working day.

Choose the business. Watch the CRM change.

One standard CRM. Eight examples of what changes when it is built around your industry.

Built for manufacturing.

Material requirements and shortages come from the customer order. Batch releases check specification and materials; dispatch checks completed production, quality release, quantity and paperwork.

What changes from the standard CRM
  1. 01Part, quantity and lead-time fields
  2. 02Costing approval before quoting
  3. 03Production milestones after order confirmation

Put these workflows to work for your business. Your CRM is designed around your own team, records and priorities.

Request your CRM quote ↗
Interactive demo / Manufacturing
•••

Kestrel Precision / Overview

Good relationships. Clear next steps.

A fictional working day / 12-10-2026

From a costed requirement to a traceable shipment.

Three completed lots have passed inspection and shipped. Another is ready to dispatch, a live batch is in production, and a material shortage and failed pressure test show where the next intervention belongs.

  • Resolve component shortages before production release
  • Hold nonconforming lots until verified reinspection
  • Ship only the released quantity with its paperwork
Manufacturing / Business priorities

Keep material, production and quality aligned.

Calculated from 31 operational records linked to 8 customer work records in your current search and owner scope.

Plan ahead
Demo day: 12-10-2026 · through 11-11-2026
The decisions that matter next

11 operational alerts

0 critical11 to act on0 to plan

Figures describe the current fictional records, not a historical trend. The planning horizon changes upcoming dates; overdue work and current blockers remain visible. Open any metric or alert to inspect the supporting records.

The working day behind the customer relationship

Your manufacturing desk

4 dedicated sections
Your next move

Keep the conversation moving.

4 open
  • Precision housings · Alex Morgan
    12-10-2026
  • Sensor enclosures · Sam Ellis
    12-10-2026
  • Valve components · Sam Ellis
    13-10-2026
  • Machined brackets · Jamie Reed
    15-10-2026
Relationship health

Where your work stands.

Counts reflect the records shown. Each industry has its own working stages.

Customer history

The context stays connected.

  • Current customer requirements reviewed; the next commercial step has a named owner.

  • Customer agreed the work. Delivery is active; the remaining checks and next commitments are tracked in the industry desk.

  • Current customer requirements reviewed; the next commercial step has a named owner.

  • Customer agreed the work. Delivery is active; the remaining checks and next commitments are tracked in the industry desk.

Close to a decision

Make the next step clear.

No decisions waiting

Progress an opportunity to see its next decision here.

Real interactions. Fictional people and figures.

Explore freely. Changes stay in this browser; no emails, payments or customer systems are connected. Industry checks illustrate an agreed workflow, not legal or safety certification.

Manufacturing CRM demonstration

Manufacturing: enquiry to production

The sales team needs the same specification as production. Carry quantities, lead times and costing decisions from the customer conversation into the order.

Follow a real business process

Ship a released lot of 240 housings

A costed order, released material, retained inspection failure and traceable shipment. Start the guided walkthrough above, make each decision and see the working dashboard and report change. Your main example keeps its saved changes.

  1. 01

    Record the enquiry

    Alder Instruments requests 240 housings to KP-H240 / rev B. Keep the drawing, quantity and lead time with the quotation.

  2. 02

    Approve costing and release materials

    Review the BOM and bring available billet stock to 480 components: two per housing. The material shortage clears before production release.

  3. 03

    Confirm the purchase order

    Record the customer's order and release the batch specification. Production and dispatch retain the same lot reference.

  4. 04

    Complete production

    Record the completed batch. Dispatch still waits for quality release and conformity paperwork.

  5. 05

    Record the inspection failure

    One of ten sampled housings fails tolerance. Record the non-conformance and hold the lot; the report now includes these actual inspection results.

  6. 06

    Verify reinspection and release

    Record the verified corrective action and release the lot. The original failure remains in the recorded sample pass rate.

  7. 07

    Dispatch with conformity evidence

    Attach the agreed conformity paperwork and record all 240 units dispatched. The quantity ledger and locked dispatch history protect the shipment.

Start the manufacturing customer journey ↑

From a costed requirement to a traceable shipment.

Three completed lots have passed inspection and shipped. Another is ready to dispatch, a live batch is in production, and a material shortage and failed pressure test show where the next intervention belongs.

Resolve component shortages before production release

Hold nonconforming lots until verified reinspection

Ship only the released quantity with its paperwork

Explore a fictional working day on 12-10-2026: completed work, active customer delivery and the next enquiry, all connected to the dashboard and reports above.

01

Part, quantity and lead-time fields

Your customer record includes part reference, order quantity, lead time in weeks.

02

Costing approval before quoting

Approve the costing before issuing the quote. Record the customer’s purchase order before creating the production order.

03

Production milestones after order confirmation

Once a record reaches Order confirmed, its customer and owner carry into production orders. You can complete milestones and trace each change in the history.

The details your industry actually works with.

Production, quality and fulfilment report

Your dashboard prioritises the work behind these measures. Reports show the supporting customer records, calculation definitions and owners. Open an alert to inspect its source, plan seven, thirty or ninety days ahead, and download the report for your current search and owner scope.

Material shortages

BOM requirements greater than recorded component stock

Batches awaiting completion

Planned, released and in-production lots

Quality holds

Distinct batches with inspections not yet released

Dispatches blocked

Open shipments with production, quality, quantity or paperwork blockers

Units in open production

Quantity across uncompleted batches; not available stock

Recorded sample pass rate

Weighted across recorded inspection results; planned samples excluded, original failures retained

This is an interactive demonstration with fictional records. Your organisation’s process, responsibilities and checks would be agreed before a live system is built. The sample checks do not establish regulatory compliance.

Compare with the standard CRM →

What would your CRM need to do differently?

Tell us about your customer journey and operational priorities. We will help you define a CRM that connects your team’s work, with a clear investment and delivery plan.

An outline is enough. Reply within one working day.

Call us on 01603 339222.

Designed around your work

Your workflows, commercial rules and customer experience shape your system.

Owned by your business

Your commissioned source code and documentation give you control over your investment.

Supported as you grow

A Managed SLA combines system protection, support and agreed improvement time.